Project For:
Cement Roadstone Holdings
Located In:
Limerick
About This Project:
2 Large heavy duty cantilever sliding security gates were installed in this busy quarry for CRH on the outskirts of Limerick City. Access control is operated from the control room via a time-clock system during the day and a Long Range Reader system controls truck traffic after hours. A Paxton tracking system is also installed which gives management detailed reports on vehicle entry and exit.